HIVE Digital Posts 85% EBITDA Jump as AI Hosting Gains Traction
HIVE Digital booked $24.8M in adjusted EBITDA for fiscal Q2 2027, up 85% sequentially, while non-cash charges drove a $78.7M GAAP loss and AI hosting revenue grew 70.7%.

Outputs
HIVE Digital reported $24.8M adjusted EBITDA in fiscal Q2 2027, up 85% from $13.4M the prior quarter
GAAP net loss reached $78.7M, driven by $54.9M depreciation and a $31.2M mining equipment impairment
Total revenue hit $84.9M, with $76.0M from mining (1,070 BTC) and $8.8M from HPC hosting, up 70.7% YoY
BUZZ HPC carries a ~$40M annualized revenue run-rate and $185M in contracted revenue
HIVE held $139M in cash and $22.6M in digital currencies as of September 30, 2026
HIVE Digital Technologies booked $24.8 million in adjusted EBITDA for its fiscal second quarter of 2027, an 85% jump from $13.4 million in the prior quarter, even as non-cash charges pushed the Bitcoin miner turned AI host to a $78.7 million GAAP loss.
The quarter, which closed September 30, 2026, tells two stories on one scoreboard. Cash generation is improving fast. Accounting losses are widening at the same time. Both numbers come straight from the company's reported financials.
What does the scoreboard actually say?
Total revenue reached $84.9 million, up 7.3% from the previous quarter. Against the same period a year earlier, revenue slipped 2.7%. HIVE trades on both the Nasdaq and the TSX under the ticker HIVE.
Bitcoin mining still carries the business. Digital currency mining brought in $76.0 million, tied to 1,070 BTC mined during the period.
The high-performance computing hosting side contributed $8.8 million. That line grew 70.7% year over year, the fastest-moving item on the income statement by a wide margin.
Why the GAAP loss looks so ugly
The $78.7 million net loss compares with a $15.8 million loss in the same quarter last year. Most of the damage never touched the company's bank account.
- $54.9 million in depreciation
- $31.2 million in impairment on mining equipment
Together those two items total $86.1 million, which exceeds the entire GAAP loss. Depreciation spreads machine costs over useful lives. An impairment is a one-time admission that equipment is worth less than the books said. Strip both out, and the operating picture looks considerably healthier — which is exactly what adjusted EBITDA is designed to show.
How big is the AI bet?
HIVE closed the quarter with $139 million in cash and cash equivalents, plus $22.6 million in digital currencies as of September 30, 2026.
The AI hosting business runs under the BUZZ HPC banner. According to the company's reported figures, BUZZ HPC carries an annualized revenue run-rate of approximately $40 million. It also holds $185 million in contracted revenue waiting to convert into recognized sales.
What does this change for HIVE?
The core takeaway: HIVE runs a two-engine model, and one engine still does most of the work. Bitcoin mining generated the bulk of the $84.9 million in revenue. HPC hosting grows far faster, but from a much smaller base.
The 85% sequential EBITDA jump shows operating cash generation improving quickly. The 2.7% year-over-year revenue dip is a reminder that growth is not uniform across every comparison.
Two items deserve shareholder attention in the coming quarters. First, whether the HPC segment keeps compounding anywhere near its 70.7% annual pace, and how quickly that $185 million in contracted revenue turns into recognized sales. Second, the mining fleet itself — a $31.2 million impairment suggests equipment is aging out, and refreshing machines could pull on that $139 million cash pile.
The next quarterly report will show whether the second engine can start carrying real weight.
via Crypto Briefing (Source)
More from Marcus Bennett
Show full bio
Senior reporter covering money, funding and market shifts around crypto and web3 industry at Mempool Brief.
1,774 articles